Ward 58:
- The total length of road constructed was 376m and 3m wide.
- Guardrails were constructed in key areas to protect existing dwellings in the vicinity.
- Stormwater control measures in the form of V-drains, pipe culverts, subsoil pipes, manholes and headwalls were implemented.
- Start Date: 19th March 2018
- Length of Project: 3 Months
- Contractor: Lungelani Trading
- Local Labourers: 12 Male, 7 Female.
Ward 60:
- Total length of footpaths was 723m and 1.5m wide.
- Precast concrete stairs were placed in sections with steep grades.
- Protection measures in the form of Loffelstein retaining walls were also implemented.
- Start Date: 19th March 2018
- Length of Project: 3 Months
- Contractor: Ivy Close
- Local Labourers: 10 Male, 6 Female.
Ward 61:
- The total length of road constructed was 676m and is 3m wide.
- Guardrails were constructed in key areas to protect existing dwellings in the vicinity.
- Stormwater control measures in the form of V-drains, pipe culverts, subsoil pipes, manholes and headwalls were implemented.
- Start Date: 19th March 2018
- Length of Project: 3 Months
- Contractor: Ndliyomlilo
- Local Labourers: 17 Male, 2 Female.
Ward 62:
- The total length of road constructed was 355m and is 3m wide.
- Guardrails were constructed in key areas to protect existing dwellings in the vicinity.
- Stormwater control measures in the form of V-drains, pipe culverts, subsoil pipes, manholes and headwalls were implemented.
- Start Date: 19th March 2018
- Length of Project: 3 Months
- Contractor: Jan Roz
- Local Labourers: 14 Male, 6 Female.