INTERIM SERVICES PROJECT

Ward 58:

  • The total length of road constructed was 376m and 3m wide.
  • Guardrails were constructed in key areas to protect existing dwellings in the vicinity.
  • Stormwater control measures in the form of V-drains, pipe culverts, subsoil pipes, manholes and headwalls were implemented.
  • Start Date: 19th March 2018
  • Length of Project: 3 Months
  • Contractor: Lungelani Trading
  • Local Labourers: 12 Male, 7 Female.

Ward 60:

  • Total length of footpaths was 723m and 1.5m wide.
  • Precast concrete stairs were placed in sections with steep grades.
  • Protection measures in the form of Loffelstein retaining walls were also implemented.
  • Start Date: 19th March 2018
  • Length of Project: 3 Months
  • Contractor: Ivy Close
  • Local Labourers: 10 Male, 6 Female.

Ward 61:

  • The total length of road constructed was 676m and is 3m wide.
  • Guardrails were constructed in key areas to protect existing dwellings in the vicinity.
  • Stormwater control measures in the form of V-drains, pipe culverts, subsoil pipes, manholes and headwalls were implemented.
  • Start Date: 19th March 2018
  • Length of Project: 3 Months
  • Contractor: Ndliyomlilo
  • Local Labourers: 17 Male, 2 Female.

Ward 62:

  • The total length of road constructed was 355m and is 3m wide.
  • Guardrails were constructed in key areas to protect existing dwellings in the vicinity.
  • Stormwater control measures in the form of V-drains, pipe culverts, subsoil pipes, manholes and headwalls were implemented.
  • Start Date: 19th March 2018
  • Length of Project: 3 Months
  • Contractor: Jan Roz
  • Local Labourers: 14 Male, 6 Female.